Sell the whole job.
Plan every package.

A self-contained demonstration of how a distributor or contractor can connect project phases, package demand, customer buying history, and procurement timing from dirt to done.

ACTIVE PROJECT No project selected Start a project or resume one from My Projects
29% Foundations active

PROJECT NAVIGATOR

Know what the job needs at every phase.

JOB-SPECIFIC PHASE SCHEDULE

What is needed—and when the work needs it.

MODELED COMPLETION · —

MILESTONE-GATED PROCUREMENT PLAN

Order backward from the work—not forward from today.

Every package carries an itemized punchout and three clocks: construction need, procurement action and knowledge history.

ACTION NOW0past or inside order window
LONG-LEAD020+ week planning horizon
PACKAGES OBSERVED0%category history available
MODELED FINISHreference schedule
ActionStage / supply packageSales-history signalOrder byNeed on siteLeadGated by
PLANNING MODEL

Dates are recommendations, not commitments. Confirm specifications, quantities, approved manufacturers, supplier capacity, submittals and the current CPM schedule before purchasing.

INDEPENDENT DEMONSTRATION

A complete project story—without a Nerva workflow.

This isolated scenario is safe to present independently. It does not create pursuits, bids, projects, Journey records, or Library records in the operational Nerva platform.

0 SAVED JOBS
ACTIVE PROJECTS0

Live jobs resume at their last saved construction phase.

COMPLETED PROJECTS0

Completed records remain available as durable planning and outcome references.

SALES DNA · CUSTOMER + PROJECT MEMORY

Turn buying history into a whole-project sales plan.

Use observed categories, manufacturers, decision context, and package timing to prepare the right conversation before the customer needs the material.

NO CUSTOMER HISTORY LOADED Bring the project’s purchasing fingerprint into view.

Expected fields: order_date, project, category, product, brand, sku, quantity, amount.

RESEARCH-BACKED SUPPLY SPINE

A strong prior—designed to learn from every contractor.

The library organizes typical work, supply packages and safety or quality gates using authoritative references. Durations and lead times remain planning priors until calibrated to live project and supplier evidence.

01

Work-result taxonomy

MasterFormat and UFGS locate each requirement in the construction scope.

02

Product attributes

Manufacturer-neutral features allow generic needs to match customer SKUs safely.

03

Backward planning

Need-on-site dates drive approval, submittal, fabrication and order dates.

04

Three clocks

Construction, procurement and knowledge time preserve the complete decision history.

SOURCE LIBRARY
WHAT IS SOURCED VS. MODELED

Sources establish work categories, process relationships, safety and quality gates, and documented supply-chain risks. Nerva’s phase ranges, item groupings, overlap assumptions and generic lead-time ranges are planning priors—not substitutes for contract documents, engineered requirements, the approved schedule or live supplier commitments.

STAGE 04 · CONCRETE

Foundations punchout

CONSTRUCTION CLOCKneed on site
PROCUREMENT CLOCKearliest package action
KNOWLEDGE CLOCKREFERENCE PRIORlast evidence update
03 11 00

Formwork + shoring

PURCHASING ITEM

Add a specific item.

Nerva inherits the phase, package, need date, order date, and lead-time context.

PROJECT SETUP

Name the project. Locate the phase.

Start with the project identity and current construction phase. The construction start plans forward; the target finish lets Nerva back-plan the sequence. Changes remain inside this standalone demonstration.

Critical dates